PLEASE NOTE
This timeline includes general building and construction highlights and does
not include
everything that is happening during a given month. This timeline is
based on estimates provided by the contractor. All dates are
tentative and subject to change.
2010 Now:
Hanging drywall and insulation.
2011 January: Elevator
installation to begin. February:
Interior doors and hardware installation to begin. March:
Painting, plumbing fixtures installed. April:
Paving drives and parking (weather permitting), finishing up. May:
Phase One scheduled for completion.
WHAT IS PHASE TWO?
Phase Two is a finished two-level auditorium
(a.k.a. the worship center) with more than 1,000 seats. The new space has been designed to
maximize intimacy while still allowing room for significant growth. This area will
be shelled-in
during Phase One. However, until we have $1 million, we will not begin completion.
PRICE TAG
$3.1 million.
AMOUNT REMAINING BEFORE WE CAN START PHASE TWO
$1 million.
CHILDREN'S WORSHIP AREA Progress in the children's worship area.
The children's worship area is a 64-foot by 38-foot area designed to fit
a high number of children in the same area for times of worshipping
together. The children will have their own lighting and sound as well
as a stage (not pictured) for times of learning and singing together.
- Commitment Cards
for More Than Walls
are available at the Information Center in the lobby at CCJ.
- Remember to denote an amount designated for More Than Walls in
the memo line of your check (above and beyond general giving).
- Building giving envelopes are also available at the Information
Center.
- If you are new to CCJ (within the past two years), please prayerfully
consider joining this project with your weekly giving.
If you would like to
unsubscribe
from the CCJ E-News, please contact
us.